Service & Operation Manuals

15.06.2021
KONGSBERG K—POS AUTOPILOT MODE OPERATION MANUAL

The Autopilot mode enables the vessel to steer along a selected course by accurately and automatically controlling the vessel's heading. This mode is using the vessel's propellers and rudders or azimuth thrusters. The Autopilot (Heading control system) has a mark of conformity (wheelmark) as per MED requirements.

The vessel speed is controlled from the joystick on the operator's panel or from manual levers (requires the K-Thrust thruster control system). Reference made also to these sections of the relevant K-Pos (OS) Operator Manual' - Sensors; Joystick settings; Changing the heading setpoint; Alarm limits dialog box - Position page (heading limits); Heading dialog box - Rate Of Turn page; Thruster Allocation dialog box.

3782 Viewing 0 Comments Read more
15.06.2021
KONGSBERG K—POS FOLLOW TARGET MODE OPERATOR MANUAL

A K-Pos system with Follow Target mode has one of two available configurations: - Follow Single Mobile Target; - Follow Multiple Mobile Targets. Follow Single Mobile Target enables the ships to automatically follow the moving targets and keeps the vessel within a "position window" relative to the targets.

The moving target must be equipped with a mobile reference transponder or laser reflector in order for the K-Pos system to monitor its relative position. If, for example, the moving target is ROV, then the ship shall be equipped with the HPR, standing for the Hydroacoustic Position Reference system. In addition to a mobile reference transponder on the target, an additional fixed position-reference system is required, such as DGPS or a fixed transponder deployed on the seabed.

You can define a circle of operation within which the target can move without causing the ship to move. The vessel only moves when the target reaches the boundary of this circle. The radius of this circle (the "reaction radius") can be up to 1000 m.

4578 Views 0 Comments Read more
15.06.2021
KONGSBERG K—POS RISER ANGLE MONITORING OPERATOR MANUAL

The operator manual for the K-POS RAM - subject system allows to optimize the position of the ship during the drilling operations. The manual has been arranged in five sections. The first section provides the introduction to the system and description of its components and functions.

The second section contains the established operating procedures including settings, drilling configuration and display options etc., while the third sections is dedicated to the displayed Riser Angle info. The two remaining sections of the manual are dealing with the system messages and special features of the simulator/trainer.

3436 Views 0 Comments Read more
15.06.2021
FANBEAM SR SHORT RANGE LASER RADAR SYSTEM

This is the officially published user manual for the FanBeam system which has been specifically designed to provide the repetitive and accurate positioning and also tracking of the marine ships together with the static/semi-static anchored facilities. The documents starts with the short technical description of the system and its major applications.

The technical specifications of this system have also been provided; the installation tips cover all mechanical/electrical matters, mounting etc. The operation and maintenance are deal with in the next chapters of the doc covering both routine system maintenance and instructions on the fault finding. The remainder of the title addresses the data output formats.

3896 Views 0 Comments Read more
15.06.2021
RADASCAN 1.0A INSTALLER'S GUIDE

The document starts with the information on the software versions and serial numbers, followed with the description of the components and instructions on mechanical installation of the system. The chapter dedicated to the cable installation gives their technical specifications and tips on connection.

The remaining chapters are dealing with the system console and DP feed connections, computer options, VFD screen, installation of the user console, data logging, set-up of the system console, creating the initial log file, and technical notes covering the message types, ethernet configuration, server upgrade, installation of the DSP image, FPGA firmware and antenna image, troubleshooting and also containing the reference checklist for the RPS.

3212 Views 0 Comments Read more
12.05.2021
AALBORG BOILER PLANT WH MS7Z INSTRUCTION MANUAL

This official AALBORG publication starts with the description of the system concept covering the technical data and boiler plant flow diagrams, followed by the information related to the burner and accessories, including drawings and associated data sheets, plus operational and maintenance instructions.

The next section of the paper addresses the electrical equipment, such as the alarm panel, sequence control, safeguard, again supplemented with the data tables and drawings. Next one is dedicated to the system accessories including feed water system/pumps, steam dump and salinity alarm equipment. The closing section provides the info on the burner/control panel spare parts.

4895 Views 0 Comments Read more
12.05.2021
AC YORK — AIR CONDITION REFRIGERATION PLANT 1200 V 3.6

The present manual has been developed by YORK Marine ApS specialists to describe the whole functionality and control of the "Standard ARP" plant. It is arranged in three major parts dedicated to the interlocks and shutdowns, display images and functionality, and function/control description.

The main content starts with the introduction where the technical description of the system, plant design and control components are provides, followed by the chapters addressing the picture hierarchy, alarm list, PI regulator function, word list, and additional functions. The document revision record has also been provided for reference.

2967 Views 0 Comments Read more
12.05.2021
AALBORG INSTRUCTION MANUAL FOR INERT GAS SYSTEM & MISSON OL BOILER & AV—6N ECONOMIZER

The full set of technical documentation pertaining to the AALBORG Inert Gas System, Mission OL Boiler, and AV-6N Economizer. The first part, for Mission OL Boiler, contains following - technical data, operation and maintenance instructions, flow diagrams, safety valves, technical description, water level gauges, feed water system, set of drawings, oil flow meter and regulating valve, data sheets, differential transmitter, ingition burner pump, combustion air pump, drawings and operating instruction and data sheets for burner, operating principles for control system, smoke density monitor, performance curves, mission control system, commissioning and service, burner sequence diagram, operation of the panels, flame safeguard, monitoring and control system, set point diagrams, menu structure for the control system, spare parts for boiler, burner, and control system.

The second part, for Inert Gas System, includes chapters covering general description of the subject system, operation, alarm and safety devices, parts list, piping and operation diagram, schematic control diagram, operating instruction, operation flow chart, operation guidance and emergency procedure, scrubber, deck water seal, pressure valve breaker, action on faults during operation, maintenance and periodical checks, inert gas system fault, recorder SR-1000, oxygen analyzer GB-II, positioner YT-1000, pressure transmitter EJA-110, pressure controller UT-420, pressure switches JM-21, RT113 and RT116, temperature indicator UM-330, flow switch BQS, level switches S01 and FR29Z, digital indicator UT-150.

5552 Viewing 0 Comments Read more
« 1 2 3 4 5 6 ... 25 26 »