CCS GUIDELINES FOR CERTIFICATION OF DRILLING PLANTS
Author(s) | CCS |
Publisher | CCS |
Date | 2006 |
Pages | 57 |
Format | |
Size | 1 Mb |
D O W N L O A D |
These CCS Guidelines provide the requirements for the design and construction as well as testing and survey of the drilling plants that are located on board fixed and mobile offshore drilling units and other offshore facilities, as applicable. Subject plants together with their systems and equipment shall be designed, constructed and subsequently tested and surveyed as per these Guidelines including all relevant standards; in addition to that, all applicable CCS Rules requirements and Flag Administration requirements shall also be complied with.
The Guidebook is covering all safety aspects of these systems and equipment relating to the drilling and well completion, workover and test operations; note that the content does not cover operation of the plants. The Guidelines cover such systems and equipment as heave compensating/tensioning systems, well control and test systems, marine riser systems, bulk storage, transfer and circulation systems, hoisting systems, rotating systems, pipe handling/BOP handling systems, all structures, control system, electrical systems and other supporting systems. All requirements and procedures to be followed have been specified in the present document.
The "Read Later" function allows you to add material to this block with just one click. Just click on the icon and read the articles that interest you at any convenient time.