LNG TRANSFER ARMS AND MANIFOLD DRAINING, PURGING AND DISCONNECTION PROCEDURE
Author(s) | SIGTTO |
Publisher | Witherby |
Date | 2012 |
Pages | 11 |
Format | |
Size | 1 Mb |
D O W N L O A D |
The first introductory part of this SIGTTO-released document says that it has been written following numerous reports from the members of the present international organization, on the confusion and misunderstanding noticed between some ship and jetty operators; that is main reason why it has been released and please note that this document mainly pertains to terminals where rigid transfer arms are employed.
The principal objective of this report was to disconnect the arms in such a way that would totally eliminate the possible risks of release of the liquid and, in addition, reduce the release of the cargo vapor to the environment to a practically achievable minimum. In order to safely and timely conduct this operation, it is critically important that a good and carefully thought out procedure has been established and that the communication between people on board and on shore is reliable and permanent, since both of them carry the responsibility for safety during subject operation.
Among the most important aspects covered within this report there are drain system, isolation of valves, liquid removal, purging flammable vapors, verification, disconnection of the cargo manifolds etc. The annexes at the end provide case studies and example procedures...
The "Read Later" function allows you to add material to this block with just one click. Just click on the icon and read the articles that interest you at any convenient time.